Total cost = Fixed cost + (Variable cost/unit) × (Number of units)
Total revenue = (Price/unit)(Number of units)
At break-even point, Total cost = Total revenue
Or Fixed cost + (Number of units) = (Price/unit)(Number of units)
Solving for the number of units at the break-even point, we get
This equation is the same as Equation M3-1.