Banks, Jerry, John S. Carson, Barry L. Nelson, and David M. Nicol. Discrete-Event System Simulation, 5e, Pearson, 2010.
Evans, J. R., and D. L. Olson. Introduction to Simulation and Risk Analysis, 2nd ed. Upper Saddle River, NJ: Prentice Hall, 2002.
Fishman, G. S., and V. G. Kulkarni. “Improving Monte Carlo Efficiency by Increasing Variance,” Management Science 38, 10 (October 1992): 1432–1444.
Fu, Michael C. “Optimization for Simulation: Theory vs. Practice,” INFORMS Journal on Computing 14, 3 (Summer 2002): 192–215.
Gass, Saul I., and Arjang A. Assad. “Model World: Tales from the Time Line—The Definition of OR and the Origins of Monte Carlo Simulation,” Interfaces 35, 5 (September–October 2005): 429–435.
Gavirneni, Srinagesh, Douglas J. Morrice, and Peter Mullarkey. “Simulation Helps Maxager Shorten Its Sales Cycle,” Interfaces 34, 2 (March–April 2004): 87–96.
Hartvigsen, David. SimQuick: Process Simulation with Excel, 2nd ed. Upper Saddle River, NJ: Prentice Hall, 2004.
Lee, Dong-Eun. “Probability of Project Completion Using Stochastic Project Scheduling Simulation,” Journal of Construction Engineering & Management 131, 3 (2005): 310–318.
Melão, N., and M. Pidd. “Use of Business Process Simulation: A Survey of Practitioners,” Journal of the Operational Research Society 54, 1 (2003): 2–10.
Metropolis, N., and S. Ulam. “The Monte Carlo Method,” Journal of the American Statistical Association 44, 247 (1949): 335–341.
Pegden, C. D., R. E. Shannon, and R. P. Sadowski. Introduction to Simulation Using SIMAN. New York: McGraw-Hill, 1995.
Sabuncuoglu, Ihsan, and Ahmet Hatip. “The Turkish Army Uses Simulation to Model and Optimize Its Fuel-Supply System,” Interfaces 35, 6 (November–December 2005): 474–482.
Smith, Jeffrey S. “Survey on the Use of Simulation for Manufacturing System Design and Operation,” Journal of Manufacturing Systems 22, 2 (2003): 157–171.
Terzi, Sergio, and Sergio Cavalieri. “Simulation in the Supply Chain Context: A Survey,” Computers in Industry 53, 1 (2004): 3–16.
Winston, Wayne L. Simulation Modeling Using @Risk. Pacific Grove, CA: Duxbury, 2001.
Zhang, H., C. M. Tam, and Jonathan J. Shi. “Simulation-Based Methodology for Project Scheduling,” Construction Management & Economics 20, 8 (2002): 667–668.