Chapter 28
Part Number & Revision Level Changes

Purpose

  • To establish rules as to when to change part numbers and when to change revision levels.
  • Changing part numbers when appropriate avoids making a rule for retrofit that says, “all units will be retrofit to the latest revision level.”

Applicability

  • All changes processed by this CM function.

Policy/Practice

  • The following logic diagram will be used to determine Part Number and Revision Level change:

PART NUMBER CHANGE LOGIC

FRU = Field Replaceable Unit / Service Assembly / Spared Assembly

  • Consider all applications of all the items changing.
  • Assemblies that are not field replaceable units (FRU) need not change Part Number even though they are not interchangeable (per the logic diagram).
  • “Part Number change” will mean a change of only the tab portion of the Part Number.
  • Top assembly (Product) will not change Part Number unless Marketing wishes to sell both versions.
  • Part Numbers need not change on non-interchangeable change if no parts have been made or if Production Control indicates that all parts made will conform (Pilot Phase parts included).
  • Phantom assemblies do not need to change Part Number on non-interchangeable change.
  • A parts list change may be interchangeable at the assembly level and, if so, it is a revision level change to the assembly drawing/parts list.
  • Parts don’t have revision levels, drawings do. Parts are made from drawings at a particular revision level. If your ERP system demands a rev level change, fool it with a 99 or XX or whatever.
  • Revision level is not a part of the Part Number.
  • A blind person working in the stockroom with a pick list part numbered in Braille and with the bins part numbered in Braille, must be able to find interchangeable parts. (Most ERP systems don’t issue parts by revision level — thus the ERP is the “blind person.”)

Procedure

  • None required.

Primary Responsibility

  • CM must keep this standard up to date.
  • The CM Manager can take exception to this standard by stating in the applicable change form why it was done.

Authorization

Authorization

VP Operations

..................Content has been hidden....................

You can't read the all page of ebook, please click here login for view all page.
Reset