Chapter 10

Transmission Line Structures

10.1 Traditional Line Design Practice 10-1

Structure Types in Use • Factors Affecting Structure Type Selection

10.2 Current Deterministic Design Practice 10-5

Reliability Level • Security Level

10.3 Improved Design Approaches 10-9

10.A Appendix A: General Design Criteria—Methodology 10-9

References10-10

Joe C. Pohlman

Consultant

An overhead transmission line (OHTL) is a very complex, continuous, electrical/mechanical system. Its function is to transport power safely from the circuit breaker on one end to the circuit breaker on the other. It is physically composed of many individual components made up of different materials having a wide variety of mechanical properties, such as

  • Flexible vs. rigid
  • Ductile vs. brittle
  • Variant dispersions of strength
  • Wear and deterioration occurring at different rates when applied in different applications within one micro-environment or in the same application within different micro-environments

This discussion will address the nature of the structures which are required to provide the clearances between the current-carrying conductors, as well as their safe support above the earth. During this discussion, reference will be made to the following definitions:

Capability:Capacity (×) availability

Reliability level:Ability of a line (or component) to perform its expected capability

Security level:Ability of a line to restrict progressive damage after the failure of the first component

Safety level:Ability of a line to perform its function safely

10.1 Traditional Line Design Practice

Present line design practice views the support structure as an isolated element supporting half span of conductors and overhead ground wires (OHGWs) on either side of the structure. Based on the voltage level of the line, the conductors and OHGWs are configured to provide, at least, the minimum clearances mandated by the National Electrical Safety Code (NESC) (IEEE, 1990), as well as other applicable codes. This configuration is designed to control the separation of

  • Energized parts from other energized parts
  • Energized parts from the support structure of other objects located along the r-o-w
  • Energized parts above ground

The NESC divides the United States into three large global loading zones: heavy, medium, and light and specifies radial ice thickness/wind pressure/temperature relationships to define the minimum load levels that must be used within each loading zone. In addition, the Code introduces the concept of an Overload Capacity Factor (OCF) to cover uncertainties stemming from the

  • Likelihood of occurrence of the specified load
  • Dispersion of structure strength
  • Grade of construction
  • Deterioration of strength during service life
  • Structure function (suspension, dead-end, angle)
  • Other line support components (guys, foundations, etc.)

Present line design practice normally consists of the following steps:

  1. The owning utility prepares an agenda of loading events consisting of

    a. Mandatory regulations from the NESC and other codes

    b. Climatic events believed to be representative of the line’s specific location

    c. Contingency loading events of interest; i.e., broken conductor

    d. Special requirements and expectations

    Each of these loading events is multiplied by its own OCF to cover uncertainties associated with it to produce an agenda of final ultimate design loads (see Figure 10.1).

    Figure 10.1

    Image of Development of a loading agenda.

    Development of a loading agenda.

  2. A ruling span is identified based on the sag/tension requirements for the preselected conductor.
  3. A structure type is selected based on past experience or on recommendations of potential structure suppliers.
  4. Ultimate design loads resulting from the ruling span are applied statically as components in the longitudinal, transverse, and vertical directions, and the structure deterministically designed.
  5. Using the loads and structure configuration, ground line reactions are calculated and used to accomplish the foundation design.
  6. The ruling span line configuration is adjusted to fit the actual r-o-w profile.
  7. Structure/foundation designs are modified to account for variation in actual span lengths, changes in elevation, and running angles.
  8. Since most utilities expect the tangent structure to be the weakest link in the line system, hardware, insulators, and other accessory components are selected to be stronger than the structure.

In as much as structure types are available in a wide variety of concepts, materials, and costs, several iterations would normally be attempted in search of the most cost effective line design based on total installed costs (see Figure 10.2).

Figure 10.2

Image of Search for cost effectiveness.

Search for cost effectiveness.

While deterministic design using static loads applied in quadrature is a convenient mathematical approach, it is obviously not representative of the real-world exposure of the structural support system. OHTLs are tens of yards wide and miles long and usually extend over many widely variant microtopographical and microclimatic zones, each capable of delivering unique events consisting of magnitude of load at a probability-of-occurrence. That component along the r-o-w that has the highest probability of occurrence of failure from a loading event becomes the weak link in the structure design and establishes the reliability level for the total line section. Since different components are made from different materials that have different response characteristics and that wear, age, and deteriorate at different rates, it is to be expected that the weak link:

  • Will likely be different in different line designs
  • Will likely be different in different site locations within the same line
  • Can change from one component to another over time

10.1.1 Structure Types in Use

Structures come in a wide variety of styles:

  • Lattice towers
  • Cantilevered or guyed poles and masts
  • Framed structures
  • Combinations of the above

They are available in a wide variety of materials:

  • Metal

    Galvanized steel and aluminum rods, bars and rolled shapes

    Fabricated plate

    Tubes

  • Concrete

    Spun with pretensioned or post-tensioned reinforcing cable

    Statically cast nontensioned reinforcing steel

    Single or multiple piece

  • Wood

    As grown

    Glued laminar

  • Plastics
  • Composites
  • Crossarms and braces
  • Variations of all of the above

Depending on their style and material contents, structures vary considerably in how they respond to load. Some are rigid. Some are flexible. Those structures that can safely deflect under load and absorb energy while doing so, provide an ameliorating influence on progressive damage after the failure of the first element (Pohlman and Lummis, 1969).

10.1.2 Factors Affecting Structure Type Selection

There are usually many factors that impact on the selection of the structure type for use in an OHTL. Some of the more significant are briefly identified below.

Erection technique: It is obvious that different structure types require different erection techniques. As an example, steel lattice towers consist of hundreds of individual members that must be bolted together, assembled, and erected onto the four previously installed foundations. A tapered steel pole, on the other hand, is likely to be produced in a single piece and erected directly on its previously installed foundation in one hoist. The lattice tower requires a large amount of labor to accomplish the considerable number of bolted joints, whereas the pole requires the installation of a few nuts applied to the foundation anchor bolts plus a few to install the crossarms. The steel pole requires a large-capacity crane with a high reach which would probably not be needed for the tower. Therefore, labor needs to be balanced against the need for large, special equipment and the site’s accessibility for such equipment.

Public concerns: Probably the most difficult factors to deal with arise as a result of the concerns of the general public living, working, or coming in proximity to the line. It is common practice to hold public hearings as part of the approval process for a new line. Such public hearings offer a platform for neighbors to express individual concerns that generally must be satisfactorily addressed before the required permit will be issued. A few comments demonstrate this problem.

The general public usually perceives transmission structures as “eyesores” and distractions in the local landscape. To combat this, an industry study was made in the late 1960s (Dreyfuss, 1968) sponsored by the Edison Electric Institute and accomplished by Henry Dreyfuss, the internationally recognized industrial designer. While the guidelines did not overcome all the objections, they did provide a means of satisfying certain very highly controversial installations (Pohlman and Harris, 1971).

Parents of small children and safety engineers often raise the issue of lattice masts, towers, and guys, constituting an “attractive challenge” to determined climbers, particularly youngsters.

Inspection, assessment, and maintenance: Depending on the owning utility, it is likely their in-house practices will influence the selection of the structure type for use in a specific line location. Inspections and assessment are usually made by human inspectors who use diagnostic technologies to augment their personal senses of sight and touch. The nature and location of the symptoms of critical interest are such that they can be most effectively examined from specific perspectives. Inspectors must work from the most advantageous location when making inspections. Methods can include observations from ground or fly-by patrol, climbing, bucket trucks, or helicopters. Likewise, there are certain maintenance activities that are known or believed to be required for particular structure types. The equipment necessary to maintain the structure should be taken into consideration during the structure type selection process to assure there will be no unexpected conflict between maintenance needs and r-o-w restrictions.

Future upgrading or uprating: Because of the difficulty of procuring r-o-w’s and obtaining the necessary permits to build new lines, many utilities improve their future options by selecting structure types for current line projects that will permit future upgrading and/or uprating initiatives.

10.2 Current Deterministic Design Practice

Figure 10.3 shows a loading agenda for a double-circuit, 345-kV line built in the upper Midwest region of the United States on steel lattice towers. Over and above the requirements of the NESC, the utility had specified these loading events:

Figure 10.3

Image of Example of loading agenda.

Example of loading agenda.

  • A heavy wind condition (Pohlman and Harris, 1971)
  • A wind on bare tower (Carton and Peyrot, 1992)
  • Two maximum vertical loads on the OHGW and conductor supports (CIGRE, 1995; Ostendorp, 1998)
  • Two broken wire contingencies (Dreyfuss, 1968; Pohlman and Lummis, 1969)

It was expected that this combination of loading events would result in a structural support design with the capability of sustaining 50-year recurrence loads likely to occur in the general area where the line was built. Figure 10.4 shows that different members of the structure, as designed, were under the control of different loading cases from this loading agenda. While interesting, this does not

Figure 10.4

Image of Results of deterministic design.

Results of deterministic design.

  • Provide a way to identify weak links in the support structure
  • Provide a means for predicting performance of the line system
  • Provide a framework for decision-making

10.2.1 Reliability Level

The shortcomings of deterministic design can be demonstrated by using 3D modeling/simulation technology which is in current use (Carton and Peyrot, 1992) in forensic investigation of line failures. The approach is outlined in Figure 10.5. After the structure (as designed) is properly modeled, loading events of increasing magnitude are analytically applied from different directions until the actual critical capacity for each key member of interest is reached. The probability of occurrence for those specific loading events can then be predicted for the specific location of that structure within that line section by professionals skilled in the art of micrometeorology.

Figure 10.5

Image of Line simulation study.

Line simulation study.

Figure 10.6 shows a few of the key members in the example for Figure 10.4:

Figure 10.6

Image of Simulation study output.

Simulation study output.

  • The legs had a probability of failure in that location of once in 115 years.
  • Tension chords in the conductor arm and OHGW arm had probabilities of failure of 110 and 35 years, respectively.
  • A certain wind condition at an angle was found to be critical for the foundation design with a probability of occurrence at that location of once in 25 years.

Some interesting observations can be drawn:

  • The legs were conservatively designed.
  • The loss of an OHGW is a more likely event than the loss of a conductor.
  • The foundation was found to be the weak link.

In addition to the interesting observations on relative reliability levels of different components within the structural support system, the output of the simulation study also provides the basis for a decision-making process which can be used to determine the cost effectiveness of management initiatives. Under the simple laws of statistics, when there are two independent outcomes to an event, the probability of the first outcome is equal to one minus the probability of the second. When these outcomes are survival and failure:

Annualprobabilityofsurvival=1AnnualprobabilityoffailurePs=1Pf (10.1)

If it is desired to know what the probability of survival is over an extended length of time, i.e., n years of service life:

[Ps1×Ps2×Ps3×Psn]=(ps)n (10.2)

Applying this principle to the components in the deterministic structure design and considering a 50-year service life as expected by the designers:

  • The legs had a Ps of 65%
  • The tension chord in the conductor arm had a Ps of 63%
  • The tension chord of the OHGW arm had a Ps of 23%
  • The foundation had a Ps of 13%

10.2.2 Security Level

It should be remembered, however, that the failure of every component does not necessarily progress into extensive damage. A comparison of the total risk that would result from the initial failure of components of interest can be accomplished by making a security-level check of the line design (Osterdorp, 1998).

Since the OHTL is a contiguous mechanical system, the forces from the conductors and OHGWs on one side of each tangent structure are balanced and restrained by those on the other side. When a critical component in the conductor/OHGW system fails, energy stored within the conductor system is released suddenly and sets up unbalanced transients that can cause failure of critical components at the next structure. This can set off a cascading effect that will continue to travel downline until it encounters a point in the line strong enough to withstand the unbalance. Unfortunately, a security check of the total line cannot be accomplished from the information describing the one structure in Figure 10.4; but perhaps some generalized observations can be drawn for demonstration purposes.

Since the structure was designed for broken conductor bundle and broken OHGW contingencies, it appears the line would not be subjected to a cascade from a broken bare conductor, but what if the conductor was coated with ice at the time? Since ice increases the energy trapped within the conductor prior to release, it might be of interest to determine how much ice would be “enough.” Three-dimensional modeling would be employed to simulate ice coating of increasing thicknesses until the critical amount is defined. A proper micrometeorological study could then identify the probability of occurrence of a storm system capable of delivering that amount of ice at that specific location.

In the example, a wind condition with no ice was identified that would be capable of causing foundation failure once every 25 years. A security-level check would predict the amount of resulting losses and damages that would be expected from this initiating event compared to the broken-conductor-under-ice-load contingencies.

10.3 Improved Design Approaches

The above discussion indicates that technologies are available today for assessing the true capability of an OHTL that was created using the conventional practice of specifying ultimate static loads and designing a structure that would properly support them. Because there are many different structure types made from different materials, this was not always straightforward. Accordingly, many technical societies prepared guidelines on how to design the specific structure needed. These are listed in the accompanying references. The interested reader should realize that these documents are subject to periodic review and revision and should, therefore, seek the most current version.

While the technical fraternity recognizes that the mentioned technologies are useful for analyzing existing lines and determining management initiatives, something more direct for designing new lines is needed. There are many efforts under way. The most promising of these is Improved Design Criteria of OHTLs Based on Reliability Concepts (Ostendorp, 1998), currently under development by CIGRE Study Committee 22: Recommendations for Overhead Lines. Appendix 10.A outlines the methodology involved in words and in a diagram. The technique is based on the premise that loads and strengths are stochastic variables and the combined reliability is computable if the statistical functions of loads and strength are known. The referenced report has been circulated internationally for trial use and comment. It is expected that the returned comments will be carefully considered, integrated into the report, and the final version submitted to the International Electrotechnical Commission (IEC) for consideration as an International Standard.

10.A Appendix A: General Design Criteria—Methodology

The recommended methodology for designing transmission line components is summarized in Figure 10.7 and can be described as follows:

Figure 10.7

Image of Methodology

Methodology.

  1. Gather preliminary line design data and available climatic data.*
  2. b1. Select the reliability level in terms of return period of design loads. (Note: Some national regulations and/or codes of practice sometimes impose design requirements, directly or indirectly, that may restrict the choice offered to designers.)
  3. b2. Select the security requirements (failure containment).
  4. b3. List safety requirements imposed by mandatory regulations and construction and maintenance loads.
  5. Calculate climatic variables corresponding to selected return period of design loads.
  6. d1. Calculate climatic limit loadings on components.
  7. d2. Calculate loads corresponding to security requirements.
  8. d3. Calculate loads related to safety requirements during construction and maintenance.
  9. Determine the suitable strength coordination between line components.
  10. Select appropriate load and strength factors applicable to load and strength equations.
  11. Calculate the characteristic strengths required for components.
  12. Design line components for the above strength requirements.

This document deals with items (b) through (g). Items (a) and (h) are not part of the scope of this document. They are identified by a dotted frame in Figure 10.7.

Source: Improved design criteria of overhead transmission lines based on reliability concepts, CIGRE SC22 Report, October, 1995.

References

Carton, T. and Peyrot, A., Computer aided structural and geometric design of power lines, IEEE Transactions on Power Line System, 7(1), 438–443, 1992.

Dreyfuss, H., Electric Transmission Structures, Edison Electric Institute, Publication No. 67–61, 1968.

Guide for the design and use of concrete poles, ASCE 596–6, 1987.

Guide for the design of prestressed concrete poles, ASCE/PCI Joint Commission on Concrete Poles, February, 1992. Draft.

Guide for the design of transmission towers, ASCE Manual on Engineering Practice, 52, 1988.

Guide for the design steel transmission poles, ASCE Manual on Engineering Practice, 72, 1990.

IEEE, National Electrical Safety Code, ANSI C-2, New York, 1990.

IEEE standard 751, IEEE Trial-Use Design Guide for Wood Transmission Structures, Piscataway, NJ, February 1991.

Improved design criteria of overhead transmission lines based on reliability concepts, CIGRE SC-22 Report, October 1995.

Ostendorp, M., Longitudinal loading and cascading failure assessment for transmission line upgrades, ESMO Conference98, Orlando, FL, April 26–30, 1998.

Pohlman, J. and Harris, W., Tapered steel H-frames gain acceptance through scenic valley, Electric Light and Power Magazine, 48(vii), 55–58, 1971.

Pohlman, J. and Lummis, J., Flexible structures offer broken wire integrity at low cost, Electric Light and Power, 46(V, 144–148.4), 1969.


* In some countries, design wind speed, such as the 50-year return period, is given in National Standards.