Appendix 8

Sample Examination Questions 2: Bullet Point Answers

1. Project-management plan (PMP)
Reflects the PM’s understanding of the project
Should be written by the PM
This enables him/her to fully understand the sponsor’s requirements
Must be updated regularly with good configuration management
Is in fact the bible of the project
Covers: Why, What, When, How, Where, Who and How much (Kipling poem)
Not to be confused with a time schedule (plan)
Can be known by other names by different companies
Contents well set out in BS 6079
Contents to include
Reasons for planning, baseline programme, responsibility matrix, document distribution schedule, procedures for monitoring and control, resource allocation, network preparation, estimating, risk management, health and safety, change control, configuration management, etc.
2. Work breakdown structure (WBS)
Next stage after conception from project life cycle
Divides the project into manageable packages
Can be product-based or work-based
Shows hierarchy of work packages
Leads to assignment of work packages and resources
Task-oriented family tree
Leads to PBS, CBS, OBS and RBS
Helps in creating a responsibility matrix
Foundation for planning and CP network
WBS called PBS in PRINCE methodology
Gives better definition of work
Acts as check list to find missing stages and areas of work
Good basis for risk identification process
Does not show interdependencies
Team members have good picture of main stages
Top down and bottom up estimating leads to network, bar chart, histogram S curve
3. Risk identification techniques
Assumption analysis
Specific, quick
Subjective, related to assumptions, restricted
Brainstorming
Cost-effective, wide ranging, involves participants, assists communication and understanding
Throws up wild ideas, requires good facilitation, risks may be exaggerated, group must be restricted, participants must be chosen
Check lists or prompt lists
Past experience tapped, good coverage, focused on right areas, rapid response
Restricted to items on list, lacks originality, could miss new problems
Delphi technique
Can be conducted by phone, post, e-mail or fax, taps expert opinion, possibility of agreement
Requires the relevant experts, takes time, requires good coordination
Document reviews
Simple to do, authoritative, very useful if document is a close-out report
Could take a long time, identification of risks may be difficult
Interviews
Confidential, specific, enables risks to be analysed, allows discussion
Requires good interviewing technique, time-consuming, requires subsequent comparison of results
Questionnaires
Structured questions and answers, encourages originality, can be answered at any time, allows for additional ideas if requested
Repetitions have to be compared, responses could be fatuous, could take time
SWOT (Strengths, Weaknesses, Opportunities, Threats) analysis
Highly focused, lists opportunities as well as threats, structured
Needs good control, parts not necessarily risk
WBS (Work Breakdown Structure)
Each stage or task can be investigated for risk content
4. Risk management procedure
Types of risk, political, economic, technical, security, environmental
Risk management plan, diagrams, P-I 3 × 3 matrix, risk log, techniques
Risk management process, software tools, Monte Carlo, @Risk, Predict, 3-point estimating
Identification, techniques, brain storming, check list, prompt list, interviews, WBS, Delphi
Assessment, priorities, impact, probability, SWOT, decision trees, Ishikawa diagrams
Qualitative analysis, quantitative analysis, risk owner, risk register
Risk management should be initiated at start of project
All projects have risk
Risk identification
Risk history or diary
Risk owner
Risk log or register
Qualitative analysis
Quantitative analysis, Monte Carlo, @Risk, Predict
3-point estimating
Impact/probability matrix
H, M & L assessment
Managing risk
5. Travel risks
Motorway congestion
Bad weather (ice, snow, storm)
Car breakdown
Roadworks
Tyre puncture
Feeling ill or sick
No parking space at destination
For risk register (log) see 53
6. Change management
Customer responsibility: impact assessment, evaluation, agreement
Sponsor responsibility: authorization, review, benefit assessment
Project manager responsibility: control procedure, monitoring, evaluation, implementation
Difference between external and internal change, effect on budget
Change control process, stakeholder input
All departments must assess time and cost effect of change on them
Key documents
Change request form
Change record: This records the effects of the change on the project
Change control register
Change authorization: This gives the effect of the change on cost, time and performance
Feedback to customer (who has right to cancel) after examining the consequences
Change register
7. Bar chart
image
8. Project and programme management
Project is unique process to achieve a set objective
Has a defined start and finish
Constraints are time, cost and resources
Project managers change
Organization can be task force, matrix or functional
Definition of a programme
A collection of related projects
Advantages and role of programme manager
Coordinate resources
Assign priorities
Oversee project managers
Reduce risk
Prepare overall milestone plan
Resolve conflicts between project managers
9. Stakeholder management
Positive stakeholders: project team, client, contractors
Negative stakeholders: pressure groups, environmental groups, planning authorities
Influence of stakeholders to be assessed, e.g.
Power to affect project
Financial muscle
Malleability
Personal involvement
Vested interest
Political bias or affinity
Stakeholder prioritization
10. Configuration management (CM)
Covers documents, drawings and components
CM planning
Item identification
Control of configuration items
Status
Verification audit
11. Risk management plan
Introduction: Why risk management, company policy
Purpose of process: Client requirement, environmental, health and safety, project viability
Scope of process, Political, Economic, Sociological, Technical, Environmental, Legal
Description of project
Specific aspects to be covered: innovations, erection, finance, sabotage, security
Type of organization: functional matrix, task force
Roles and responsibilities: managers, risk owners
Tools and techniques required: Monte Carlo, @Risk, Predict, etc.
Deliverables: risk register, matrix, action plans, contingency plans, etc.
Mitigation
12. Risk mitigation
Transference
Insurance
Reduction
Elimination
Deference
Acceptance
13. Quality tools
Quality ObjectivesSpecifications
Quality systemsCompany systems, ISO 9000
Quality planAnalysis, inspection, recording, degree of testing
Quality assuranceProcedures, processes
Quality controlChecking
Quality manualContains all the above
Checking and testingVerification, sampling, validation, certificates
Quality auditCheck that procedures are being adhered to
Quality reviews
Pareto analysis 80/20 rule
Cause and effect analysis, Ishikawa or fishbone diagram, decision trees
Brainstorming (could lead to risk assessment)
Check lists
Process flow sheets
Concentration diagrams
Activity sampling
Ranking and rating
Bathtub curves
Poka Yoka
Qualification certificates, e.g. welders qualification tests
14. Quality management
Quality planning
Quality assurance
Quality control
Quality standards
Fitness for purpose
Meets acceptance criteria
Total quality management (TQM)
Right first time and zero defect
Quality circles
ISO 9000
Quality audits
15. Milestones
Important stages
Payment points (expenditures or receipts)
Achievement points
High-level programme
Milestone slip charts show record and predictions
Milestone schedule
Marked on Gantt charts
Target on networks
Often written into a contract
Approval for change and date
For milestone slip chart seeChapter 25
16. Earned value management (EVA)
Reasons for EVA:
Shows difference between work planned, work booked (on time sheets) and work performed
Abbreviations: BCWS, ACWP and BCWP. Note: BCWS is planned (not budget)
These abbreviations are now being phased out
EV = BCWP = budget × percent complete
Control curves: budget, planned, actual, earned value, percent complete, efficiency (CPI)
Interpretation and solution if CPI and SPI are negative
Calculations: CPI = BCWP/ACWP, SPI (cost) = BCWP/BCWS
Cost and time variances: cost variance = BCWP  ACWP
Time variance = BCWP  BCWS; Final cost = Original budget/CPI
Final time = Planned time/SPI (time) or SPI (cost)
Should be geared to CP network, which can be updated from EVA feedback
If returns of percent complete are on time sheets, regular feedback is guaranteed
Computer programs have been developed to do the calculations
Advantages:
Shows trends, shows estimating errors, predicts final cost and completion time using curves and approx. calculations
Percent complete of multi-discipline, multi-contractor project possible
Trend can be seen early on in project and corrective action can be taken
Shows cost and time position on one report
Shows percent complete and efficiency on one graphical report
Weakness:
Difficulty in assessing percent complete
Wrong budget estimates
Poor feedback system
Time sheets essential
17. Project life cycle
No. of phases
Standard life cycles
BS 6079: Conception, feasibility, implementation, operation, termination
Common phases:
Initiation, conception, feasibility, definition, design, development, production, manufacture, installation, implementation, commissioning, operation, disposal
Extended life cycle includes disposal. Different industries have different life cycles
Advantages:
Ensure no unnecessary expenditure
Review possible after each phase. Go or no-go gates
Trigger for further funding
Each phase a control stage with checkpoints
Basis for WBS
Phases can be split again into stages
Phases called stages in PRINCE used in IT
Different phases can have different project managers
Gives top management an overall picture of project
Gives a rough progress position (crude bar chart)
Phases can be costed for control purposes
Can show up resource and continuity problems
Shows milestones
Developed by sponsor and project manager
18. Stage documents
ConceptionBusiness case, DCF
FeasibilityWBS, OBS, CBS, risk register
ImplementationPMP, CP network, resource chart, milestone chart, EVA
OperationOperating manuals
TerminationHandover certificate, maintenance manuals, spares list
19. Organizations
    The three project organizations are
a. Functional
b. Project (task force)
c. Matrix [combination of (a) and (b)]
Functional organization
Each department responsible for its own work
Suitable for business as usual
Ideal for routine operations and mass production
Project manager usually appointed from one department for small change projects
Project organization (Task force)
Used on large projects
Team created especially for the project
Team located in one office or building for good interaction
Good communication
Project manager has full responsibility for cost, time and performance
Team includes design, procurement and construction specialists
Matrix organization
Most common type of organization
Personnel allocated to project by departments
PM responsible for time cost and quality
Department manager responsible for the work by his/her department
See also 56 and 57
20. Communication management
Ensures good communication systems
Clear instructions and messages
All external communications via project manager
Importance of documents to be in writing
Communication by walk-about
Communications can be formal or informal
Barriers to communication
Cultural
Geographical location
Language, pronunciation
Bad translation
Technical jargon
Perception, attitude, lack of trust
Poor leadership, unclear objectives
Misunderstanding
Personality clash
Dislike of sender, selective listening
Group think
Bad equipment or equipment failure
Poor working environment, noisy office
Poor document distribution system, lost files
Unnecessarily long messages
Withholding information
Assumptions
Hidden agenda
Poor knowledge retention
Poor distribution and selective listening
Overcoming barriers to communication
Simple messages
Follow-up by testing
Confirm in writing
Improve office facilities
Bring team together
Improve motivation
Maintain equipment
Can all be overcome by good planning, good equipment maintenance and ensuring the instructions are clear and unambiguous?
It is helpful to give the reason for an instruction as this will help to ensure the cooperation.
Initial lectures on the etiquette and customs of the different cultures reduce misunderstandings. Translations should always be made by a native speaker of the language into which the document is translated.
21. Team building and teamwork
Advantages of project team
Complementary skills
Increased productivity
Project manager support
Informal communications
Strong identity with project
Common objectives
Motivation for project
Will to succeed
Focus
Good team spirit
Other methods used to build teams
Organized events, training, away days, discussions
The main characteristics of a successful team are
Mutual trust
Firm but fair leadership
Mutual support and loyalty
Open communications
Cooperation and full participation
Pride in the project and a sense of belonging
Good mix of technical skills and talent
Clear understanding of goals and objectives
Enthusiasm and confidence in success
Good support from top management
Apart from technical skills, different personality traits can be utilized to build up a balanced team and ensure that ‘round pegs’ are not driven into square holes.
For example, while some people like checking details, others prefer to be concerned with the wider picture.
By assembling the team with the different Belbin types, a balanced and competent workforce can be created.
Barriers to team building
High staff turnover
Poor leadership
Geographical separation
Internal conflict and unresolved conflict
Low morale
Lack of motivation
Ill-defined objectives
Poor environment
Lack of trust
Too many changes
Poorly defined roles and responsibilities
Poor communications
22. Conflict management
Withdrawing
Smoothing
Confronting
Forcing
Compromising
Thomas & Kilman
Mediation
Conciliation
Adjudication
Arbitration
Mitigation
Litigation
23. Belbin team roles
Balanced team, individuals in the correct slot. The roles are
Plant
Shaper
Resource investigator
Coordinator
Monitor evaluator
Implementer
Team worker
Completer finisher
Specialist
Not always possible to find the correct type
Project manager must use resources available
24. Motivation
Herzberg motivational theory
Recognition of achievement
Advancement and growth prospects
Pleasant working conditions
Increased responsibility
Job freedom
Interesting work
Perks
Maslow hierarchy of needs
Physiological needs
Security
Safety
Social
Esteem
Self-actualization
25. Business case
Defines ‘Why’ and ‘What’ the requirements are
Outlines objectives
Outlines cost, time and performance/quality criteria
Might include success/failure criteria
Should include major risks
Can have other names such as brief, scheme, statement of work (SOW) statement of requirements (SOR)
Owned by sponsor or client
Could include investment appraisal and possibly DCF/NPV, etc.
Should have assessed other options
Should have identified and considered all other stakeholders
Submitted to board for approval
26. Leadership and leadership qualities
Ability to influence rather than direct
Negotiation skill
Motivation
Initiative
Communication skills
Ability to listen
Fairness
Firmness
27. Negotiation
Planning and case preparation
Set minimum acceptances
Build up relationship
Exchange information
Bargaining
Concessions
Agreement
Documentation of settlement
28. Cash flow
Costing and monitoring methods
Cash flow forecast (outflow and inflow)
Cash flow curves (see Chapter 31 for diagram)
Cost breakdown structure
EVA for monitoring costs
Budget preparation
Commitments
Accruals
See 36 ‘estimating’
29. Handover and close-out
Acceptance by client
Acceptance certificate
Transfer of responsibility to sponsor or operator
Transfer of ownership to client
Deliverables completed and handed over
Acceptance certificate received
Operating instruction handed over
Spares lists handed over
Transfer responsibility to user/client
Material disposal arranged. This covers
Sell surplus material to client if possible
Return surplus to contractor’s stores
Return redundant office equipment and materials
Sell unusable materials as scrap
Clear site, remove huts and temporary fences
Make good roads and other areas (stockyards)
Complete all contract documentation
Complete all audit trails and file documents
30. Procurement strategy
Based on value for money
Includes all feasible options
Single source supply or competition
Partnering or not
Is construction included?
Is delivery to site included?
Standard or special contract conditions
Types of pricing, firm, fixed, target, cost plus, reimbursable, schedule of rates
Contractor selection criteria
Contractor bid meetings and attendees by contractors
Minimum and maximum number of bidders
Tender opening policy
Letter of intent possibilities
Limitations of procurement areas – UK, EC, Western countries, country of final user
Long lead items
Signatures for different levels of contracts
Types of contract
lump sum
remeasured
reimbursable
target, design
build and operate
31. Contractor selection
Expediting and inspection requirements
Procurement and delivery schedule
Liquidated damages
Incentives
Discounts required
Cash flow and payment terms
Shipping restrictions INCO terms
Guarantees and liabilities
Packaging and storage requirements
Spares lists
Operating and maintenance manuals
After-sales service
32. Tuckman team phases
    Team development may change to reflect phase changes
    Tuckman found teams undergo stages
FormingStart of project
StormingJockeying for position; potential staff conflict
NormingSmooth running
PerformingFully integrated working and high morale
MourningEnd of project, breakup of team
    Project manager must take care staff does not leave too soon as project nears the end.
33. Project context environment
Context within which project is undertaken
Takes account of internal and external forces
Client, company, contractors, suppliers, consultants, public, end users, etc.
PESTLE (Political, Economic, Sociological, Technical, Legal, Environmental)
34. Why do projects fail?
Poor planning and cost control
Incompetent project management
Sponsor support lacking
Client makes too many changes
Changes too large or extensive
Late safety requirements
Costs underestimated
Lack of change control
Lax configuration management
Environmental changes
Unforeseen climatic conditions
Integration problems
Technical and teething problems
Inadequate resources of staff and equipment
Poor working conditions
Uncooperative line management
Sabotage and political upheaval
Cost, time and performance requirements not met
Inadequate support from top management
Inadequate specification
Loose agreement with client
Loose contractual conditions
Ill-trained staff or operatives
Fundamental design faults
Late deliveries of information and equipment
Insufficient inspection and expediting
Poor cash flow
Insolvency of subcontractor
Unclear original brief causing misunderstanding
Commissioning problems stakeholder management
35. See answer to question 8.
36. Estimating
Sets out what information and data are required from:
Clients, end-users, other stakeholders
How information is captured, collated, assessed
How data are analysed and tested
Changes must be logged, reviewed and tested
37. Investment appraisal
DFC, NPV
Advantages: time value of money, compares competing projects
Disadvantages: complex, wrong estimates, relies on accurate discount rate
Payback
Advantages: simple, can be discounted
Disadvantages: time value ignored, cash flow after payback period ignored
IRR, graphical solution, average return per annum, return on investment percent
Intangible benefits: marketing, impact on business, prestige, social benefits, environmental benefits
Consider other options, risks, accounting practices, stakeholder views
38. See answer to question 36.
39. Resource management
Resource allocation
Resource histogram
Resource scheduling
Resource levelling due to constraints, i.e. lack of labour, materials, plant, etc.
Resource smoothing uses up float to reduce labour usage
Replenishable resources and renewable resources
40. Organizational roles
Steering group or steering committee
Function of project office (if established)
Role of client and end user: Specifies and operates finished plant
Role of sponsor: Owns business case, monitors performance, ensures resources, ensures benefits are realized, agrees variations
Role of project manager: Controls cost, time and performance of project, responsible for quality and safety, reports to sponsor and stakeholders
Project manager’s charter
Stakeholders
Contractors and suppliers responsibilities; supply specified equipment, materials and plant and manpower to meet set programme and performance requirements.
41. Handover documents
Handover certificate
Equipment list
Operating manuals
Maintenance manuals
Spares list
Guarantees
Lubrication schedule
42. Health and safety
H and S Standards
Laws: HSWA 1974 (Health and Safety at Work Act)
Management of Health and Safety
Regulations 1992 covers
Safe plant and equipment
Dangerous substances
Safe workplace and access
Protective clothing
Safe environment
Information and training
Reporting
CDM (Construction, Design and Management) Regulations
Consumer Protection Act 1987
Common law duties (negligence) apply
Accident causes
Lack of safety training
Badly maintained equipment
Inadequate protective clothing and headgear
Unsecured ladders and scaffolding
Poor unsafe design
Unprotected pits and trenches
Unsafe construction of trench supports
Ignorance of safety procedures
Inadequate protection when using toxic substances
Inadequate safety warning signs
43. WBS of bicycle
Assembly drawing
Frame
Handlebars
Wheels and tyres
Pedals
Gears and chain
Saddle and carrier
Mudguards
Lights and bell
44. See answer to question 37.
For graphical solution see Chapter 6, Fig. 6.2
45. Project office
Collection and collation of reports and time sheets, etc.
Administrative support to project manager
Dissemination of instructions
Operation of configuration management system
Administration of change control
Library for standards and procedures
Records progress information
Produces curves and tabular information for use by project manager
Writes up and distributes minutes of meetings
46. Post-project review and evaluation
Reviews should be held throughout the project
Close-out meeting with project team
Evaluation against success criteria
Prepare post-project appraisal and write close-out report
Include abstracts from project diary and site diary where necessary
Highlight problems encountered, cost and time overruns, special delays
Report on project team performance
Recommendations for future projects, learning from experience
Evaluate project-management process
Evaluate techniques employed
47. See answer to question 22.
48. Project manager
Characteristics:
Knowledge of planning tools
Ability to control costs
Ability to get on with people
Does not panic when things go wrong
Is fair but firm
Ability to negotiate
Appreciation of importance of safety
Ability to write clear, concise reports
Good communicator and listener
Can motivate the team he/she leads
Is aware of corporate priorities and policies
Leads by example
49. AoA and AoN networks (CPA)
AoA network pro
As activities and durations are on the link lines (arrows), they can be more fully described
Can be drawn rapidly by hand without instruments
Progress can be updated by ‘redding’ up the lines in proportion of percent complete
As activities take time, they are more logically represented by an arrow
Streams of activities can be interlinked with dummy activities which can cross other activities
Can be drawn on a grid with links being able to cross activities
AoN (precedence) networks pro
Activities and durations are shown in or above the nodes
There is no requirement for dummy activities
Activities are defined by one number instead of two as in AoA
Can be drawn on a grid, but links cannot cross activity nodes
Lester diagram is a combination of both, gives best of both worlds
50. See answer to question 37.
51. Portfolio management
If projects are not directly related, it is portfolio management
Prioritize projects against needs of organization
Allocate resources and eliminate bottlenecks
Assess risks of projects in portfolio
Decide on timing of project starts
Monitor performance of all projects
Ensure good cash flow and profitability
Carry out cost–benefit analysis of projects
Portfolio management is a subset of corporate management
It is concerned with the organization, planning and control of a number of projects which are not necessarily connected with each other.
Its function is to ensure that the projects in the portfolio are aligned with the organization’s strategy and meet the cost, programme, quality and performance criteria.
52. Project success criteria
The success of a project can be measured by the following criteria
Completion on time
Performance in accordance with the specified requirements
Meeting the quality standards
Completion within cost budget
Compliance with Health & Safety regulations
53. Change register
Essential headings on change register
Project title
Date of request to change
Name of instigator
Description of change
Reason for change
Time and cost estimates from each department
PM’s summary of effects
Approval of change and date
54. Information management
Information management is concerned with the following functions
Acquisition of information
Data collection
Preparation of data
Dissemination to interested parties (stakeholders)
Storage, retrieval and archiving
Collection and capturing of information
Collation and distribution
Procurement and maintenance of equipment
Confidentiality
Modern IT systems permit huge amount of data to be collected.
This requires processing for both quantity and quality.
Timing is also essential, as late dissemination can seriously affect decisions.
All this has to be done efficiently by using an information system which is enshrined in an information policy plan.
55. Value management
In a constantly changing environment, systems, procedures and products must be regularly examined and updated to meet the needs of the stakeholders’ value management and its subset value engineering is concerned with the strategic question of what should be done to improve performance without affecting the quality. Its aim is to improve the functionality of a product or system while reducing the overall cost.
Techniques include:
Functional analysis
Investigate alternative solutions to meet function requirements
Verbs and nouns technique
Evaluation
Acceptance, implementation and audit
56. Project management versus functional line management
    PM advantages:
Greater efficiency and effectiveness in employing tools and techniques used in project management
One person, the project manager, is responsible
Sponsor knows at start what the deliverables will be
Sponsor can see the PMP and be assured the correct procedures are being used
Dedicated manager in charge of cost, expenditure and programme, strong commitment
More line organizations are moving towards project management for change
Monitoring and control through life of project
Single line of communication with all parties, especially external parties
Single line of reporting
Project manager is trained to handle the stresses of change
Learning from experience through post-project reviews
Project-management good training for top management due to wider vision
Line managers may be distracted by having to deal with line management functions
Spirit of dedicated project team not present in functional organization, high motivation
No competition for resources from other departments
    Disadvantages:
Less job security than in functional organization
At times could be inefficient due to delays in information
Could develop parochialism and arrogance
Project objectives could eclipse company objectives
Not as strong specialist skills as functional department
Not as efficient in resources as functional department
Reporting line not as clear as in functional department
The difference between project management and line management is that the project has a defined start and end date with a set cost budget and performance criteria.
Line management on the other hand deals with the day-to-day business-as-usual operations of the company.
For this reason the matrix type of project management is arguably the preferred project organization, as the normal business is not disrupted while the changes such as new systems or structures, which require project management, can be accommodated.
57. Matrix project management
    Advantages:
Fast response to resource change, flexible
More economical that task force
Stronger specialist base, knowledge not lost
Existing resources use state-of-the-art technology
Common facilities (computer programs) shared
Career prospects unchanged contract labour more easily taught and absorbed
    Disadvantages:
More executive input required, possible conflict between PM and functional manager
Possible resource priority disputes between projects and function
Not as integrated as a task force
Less commitment to project than department
Personnel have two bosses, conflicting priorities
Requires more interdepartmental coordination which could be complex
PM has not the same authority to commit resources
PM not responsible for pay and rations
Of the three main types of project organization, i.e. functional, matrix and task force, matrix is probably the most common.
image
Diagram of project organization.
It utilizes the existing functional departments to supply the human resources, without disrupting the day-to-day operation of the various departments.
The personnel allocated to the project are responsible to the project manager for meeting the time and cost criteria, but report to the functional manager who is responsible for quality and technical competence.
As the functional manager is in charge for ‘pay and rations’ and recommendation for promotion, there may be a conflict of interest which has to be managed and can be a real challenge for the project manager.
58. Project success and benefit analysis
Define benefits and agree on method to measure benefits
Set success criteria
Set and monitor key performance indicators (KP)
Resource histogram, resource smoothing, peak reduction and ‘S’ curve
PERT and use of 3-point estimates for durations
Maximizing parallel activities to reduce overall time
Options to be examined as part of business case
Non-financial benefits may be difficult to quantify
Sydney opera house was a success, but a failure in terms of cost and time
59. Project governance
Project governance covers:
Structure to obtain objectives
Monitoring performance
Standard procedures
Quality Assurance
Corporate Policy and transparency
Delegation of authority
Reporting procedures
Ethics
60. Information management
Topics included in the information management plan are:
Types of document
Authority and standards
Distribution
Retrieval
Acquisition/modification permits
Acknowledgements of receipts
Security of data
Disaster recovery
Configuration control
Distribution of documents
All these have to be done efficiently by using an information system that is embedded in an information policy plan